In the middle of the project we thought we had a solid design and ordered some of the parts of the satellite tracker of which most showed up on time but a few were delayed for a while. Our time working is mostly spent running from the post office to Ace to get our parts as well as we used the laser cutter to make a plastic box that will hold all of the electronics and the antenna for the satellite tracker. The tripod is also now attached to the box through a servo gear system that can rotate the box 360degrees.
Other than that progress has been a little slow because of the waiting on materials to show up but overall there is progres and it’s really great working with Rhys and Rowen on this project.